Enabling works for a development: modelling, coordination and a cut and fill study

Rendered view from the model of site offices, shaded parking and the site entrance
Site offices, parking and the site entrance in the model.

Project data

Location
Saudi Arabia
Model covers
Site roads, site offices, a temporary access road, generators, tanks, parking and office interiors

Project requirements

Before the main works start, the project requires its enabling works to be modelled and coordinated, including a temporary access road with a 200 m level difference.

Our scope of work

We model the site roads, the site offices with their MEP services, the generators, tanks, parking and office interiors, and coordinate them. On the temporary access road, we study cut and fill through the model and propose optimisations to the designer for approval.

Deliverables

  • Model of the site roads, the site offices and their MEP services
  • Cut and fill study from the model, with proposed optimisations
  • Coordinated model of the enabling works