BIM coordination and clash detection

OnePoint BIM federates the architecture, structure and MEP models into one model, runs clash detection in Navisworks, and the solution for each clash is agreed with the designers before construction.

Coordinated MEP model of a plant room: ducts and pipes
A coordinated MEP model of a plant room.

When it is used

Before shop drawings are issued

Checking that ceilings and risers have room for every system before shop drawings are issued.

Spaces crowded with services

Plant rooms, corridors and risers, where the systems meet the structure.

Required by the BEP

Clash detection cycles and reports at set intervals are part of the contract requirements.

To avoid rework on site

A clash solved in the model costs less than one solved after construction.

What you receive

How we work

Clash detection: a duct running through a beam in the combined modelA

This cycle

The same duct rerouted after coordinationBC

Next cycle

  1. Federating the models
  2. Clash detection
  3. Proposing solutions
  4. Updating and rechecking
  1. The duct hits the beam. The clash goes into the clash register.
  2. The fix is agreed with the designer and the model is updated.
  3. The ceiling height the consultant set is kept.

Clash detection cycleIllustration

Common questions

What is clash detection?

Clash detection is a check of the federated model of all disciplines that finds where elements cross in the same space, for example a duct that crosses a structural element. Each clash is recorded, and its solution is agreed before drawings are issued.

Who approves the solution to a clash?

The designer and the consultant. We present each clash with a proposed solution, and where the model shows a better route or a saving in space we propose it with views from the model.

Do you take part in coordination meetings?

Yes. We take part online with the clash register on screen, and in person at key reviews on request.

We would be glad to study your project

To price the work we need the latest models or drawings of each discipline, the BEP or the clash rules in the contract, and the coordination meeting dates. We confirm receipt and tell you when the offer will be ready.