Mall: MEP as-built model at LOD 500

Project data

Location
United Arab Emirates
Disciplines
MEP
LOD
500
Model covers
Two basements, a ground floor, two upper floors and a roof terrace

Project requirements

The project requires an as-built model of the MEP systems on every floor of the mall.

Our scope of work

We model the MEP systems as built on each floor, from the two basements to the roof terrace.

Deliverables

MEP as-built model at LOD 500.

Planning a similar project?

Send your drawings or RFQ/RFP. We confirm receipt and tell you when the priced offer will be ready.