Hotel and commercial towers in Jeddah: BIM modelling, coordination and shop drawings

Project data

Location
Jeddah, Saudi Arabia
Year
2026
Status
In progress
Client
Main contractor
Disciplines
Architecture, structure, MEP, fire fighting, ELV
LOD
400 for the construction models, 500 for the as-built model at handover
Area
More than 24,000 m2

Project requirements

The project requires BIM management to an approved execution plan, models of five disciplines, coordinated shop drawings during construction and an as-built model at handover.

Our scope of work

We prepare the BIM Execution Plan (BEP) and the information delivery plans, review the design information and report on it, then build the models from the approved design. Clashes between the disciplines are found and solved in the model before the shop drawings are produced from it. The model is linked to the construction programme (4D) and quantities are taken from it (5D). The as-built model is delivered at handover.

Deliverables

  • BIM Execution Plan (BEP) and information delivery plans (MIDP/TIDP)
  • Design information review report
  • Discipline models at LOD 400
  • Clash detection between the five disciplines, with a clash register and coordination reports
  • Coordinated shop drawings, with builder’s work opening and reflected ceiling drawings
  • 4D model linked to the construction programme
  • Quantity take-off and BOQ from the model (5D)
  • As-built model and drawings at LOD 500 at handover